Halfway through the completed project
The sump pump was in place, the walls had been cleaned and sprayed, and the Tuff-Scrim has been hung. The start of the drainage system is underway and once completed the project will be finalized.
After the drain was installed
The French Drain was installed and the floor was then concreted.