Inadequate Support
Our team replaced these support columns with SmartJack Support Posts.
Additional Support
To lift and level the sagging floor above, the SmartJack System was installed to the main beam in the basement.
Permanent Support
The SmartJack System can support vertical loads exceeding 60,000 pounds, which is far stronger than conventional concrete repairs!
Concrete Footing
We installed a concrete footing to ensure the system will not shift or settle.
Old Support System
The support posts and beams have decayed, resulting in floor sagging and loss of integrity